MFG-Y2026.001 FORM 00 MFG INSPECTIONS (573) 275-7647 SCAPULAR NETWORK →
Quote intake Acknowledgment within one business day

Request a manufactured home structural inspection.

Drop the property address, the product you need, and any active close or rush dates. Acknowledgment within one business day; written quote with exact figure same business day; field-visit window confirmed within 24 hours; sealed PDF in 24 hours.

Standard SLA FORM 06.A
Ack.< 1 hour
QuoteSame biz day
Field< 24 hours
Sealed PDF24 hours
Visit within 48 hrsRequest availability
Visit within 24 hrsRequest availability
Eng.Scapular Engineering, P.E.
2026 RATE SHEET P.E.
FORM 06.B STANDARD INTAKE

Tell us about the property.

Whatever you know about the property is enough to start. We'll fill in the rest once we acknowledge and route the file.

Standard Intake FORM 06 · MFG-INT.2026
Street address, city, state, ZIP. County is optional but helpful.
If you're between products, "not sure" is fine. We'll route on acknowledgment.
Who will receive the sealed report. Lender name, carrier, dealership, etc.
For active deals, calling is faster than the form.
Enter an email address or phone number so we can reply.
Anything that would help with scheduling or scope.
Acknowledgment within one business day during business hours. Written quote same business day. Your quote confirms the field-visit window, report-delivery target, and any rush fee.
FORM 06.C WHAT HAPPENS NEXT

Your request. Five steps.

From request to inspection and sealed report
D+0Intake
You submit the intake

Acknowledgment by email within one business day. If we have clarifying questions, we ask in the acknowledgment.

< 1 hourACK
D+0Same day
Written quote same business day

Exact figure for your address and product, with travel and rush surcharges itemized. No surprise charges at delivery.

Same dayQUOTE
D+1Schedule
Field-visit window confirmed

Within 24 hours of order confirmation, we send the scheduled window. Scheduling depends on location and availability; any rush commitment is confirmed in your quote.

< 24 hrSCHED.
D+1On site
Field visit happens

60- to 90-minute inspection on site. Photos taken, measurements recorded, data plate transcribed, cert labels verified.

~90 minFIELD
D+1Delivery
Sealed PDF delivered

To the email you specified on intake, with copies routed to the recipient (lender / carrier / dealer / buyer) if you've authorized direct delivery. Ready to drop into the file.

24 hoursSEALED
Scapular Engineering

MFG Inspections is part of Scapular Engineering.

Manufactured-home structural reports here; FHA foundation reports, affixation documents, aluminum wiring certifications, and load-bearing wall assessments through the rest of the firm. One engineer of record, licensed in seven states.

Visit the firm

Moved home? Start with the structural report.

A new conventional financing path may require a post-move structural integrity inspection.

Get the moved-home structural integrity report →